This prestigious, multi-phase development is delivering over 150 new apartments and office space to Watford.
Commercial
Center Parcs Longleat
Great to showcase the completed job at Center Parcs, Longleat.
Aermec UK
Just complete – phenolic section on concealed pipework within the office, and phenolic section and Isogenopak sheeting on the ‘on show’ pipework within the warehouse. All of this for Aermec UK in Southend-on-Sea.
75 King William Street
Pleased to announce that we have recently completed some insulation work at the prestigious 75 King William St, London build.
Where we fitted acoustic polymeric barrier on the building’s soil vent pipework (SVP) and Icerock ductwrap on the ductwork.
Air Blast Fawley
Air Blast designs, manufactures, and installs blast rooms for the Aerospace, Defence, Oil & Gas, Marine, Rail, Transport, and Energy sectors as well as building spray booths. They had poorly insulated pipework throughout their plant area. In six weeks, we insulated the extract ductwork from the spray booth using Thermaduct slab with a black Proclad finish. We also insulated their external plant layout with Rockwool foil section finished with PIB sheeting. As a result, Air Blast expect to see heating costs reduced